"

Documentation OSP Work

Trenching by digging condition hard soil


Reinstatement work after trenching





Trenching by manualy boring and this metode recomended from local government

Directional boring cable route cross Railway






This metode must be used for cross Railway.
One of the conditions permit released from Ministry of Transportation Directorate General of Railways

No comments:

Post a Comment